Title: Upgrading of the Spilje HPP
Author: Ivanova-Davidovic, Jasna
Author: Cingoski, Vlatko
Author: Pavleski, Vlatko
Author: Saveski, Vasil
Abstract: Total generation capacity of the electric power system of Republic of Macedonia is 1444 [MW], out of which 1010 [MW] are installed in TPP and only 434 [MW] in HPP. The hydropower production is subordinate to the thermal one with a specific and highly defined role in the whole electricity sector. HPP Spilje usually operates so the available water storage is used rationally and the overflows are minimal. This was achieved by enlargement of the water storage useful area as a result of the decreasing the minimal operation level. This paper deals with some additional possibilities for further upgrading of the installed capacity of this power plant for achieving better operational performances.
Publisher:
Relation: https://eprints.ugd.edu.mk/7604/
Identifier: oai:eprints.ugd.edu.mk:7604
Identifier: https://eprints.ugd.edu.mk/7604/1/Upgrading%20of%20the%20Spilje%20HPP.pdfIdentifier: Ivanova-Davidovic, Jasna and Cingoski, Vlatko and Pavleski, Vlatko and Saveski, Vasil (2004) Upgrading of the Spilje HPP. In: 13th Seminar on Hydropower plants, 22-24 Nov 2004, Vienna, Austria.